01Create
Create and specify
From the idea to a technical drawing ready to produce — the tech pack filling itself in from what already exists.
Creative StudioCollectionsTech packPattern making / CADColours & printsMaterials
Roles: Designer e Pattern maker
02Decide
Cost and decide
Should this style be launched, and in what volume? Cost, price, demand and risk on the same screen.
CostsPricingDemandMarketApproval board
Roles: Cost analyst e Salesperson
03Produce
Plan and produce
The decision becomes an order: real capacity, contractors end to end, shop-floor reporting.
TimelineCapacity (APS)Shop floor (MES)ContractorsPurchasing
Roles: Planner, Floor supervisor e Buyer
04Measure
Measure and learn
Real time per operation, defects at the source, sales — everything comes back and sharpens the next decision.
Time studyQualityMaintenanceIndicatorsCompensationERP integration
Roles: Inspector, Analyst e Mechanic